The Frankford Canal Bridge is going to be undergoing maintenance, which will require some lanes and sidewalks to be closed while the work is completed.
From May 20 to August 29, bridge traffic will be reduced to a single lane. Traffic will be able to proceed across the bridge in both directions using an alternating one-way traffic light. Motorists are advised to expect delays.
From May 20 to July 9, the sidewalk east of Frankford Tourist Park will be closed. Access to the park will be maintained.
The maintenance work will include substructure concrete repairs, sidewalk handrail repairs and road resurfacing.




