Work to revitalize the wooden entrance peak at Shire Hall in Picton will continue to August 2.
Prince Edward County says work will take place between 8 a.m. and 4 p.m. and may result in the main entrance being closed for short periods.
The public will be directed to enter Shire Hall using the ramp entrance located at the side of the building.