Repairs have been completed on a bridge east of Campbellford that was closed for almost a month.
The structure on the Seventh Line was shut down on September 21st after the bridge deck dropped and some beams were damaged.
Trent Hills Public Works Director Richard Bolduc says a bridge contractor did eight-thousand dollars in repairs, and the Hays bridge has been reopened.
The bridge, east of Petherick’s Road, is supposed to be replaced next year.